---
title: "Huge Generation and Storage Hub Proposed for Central QLD"
url: "https://ahlecsolar.com.au/2021/10/22/huge-generation-and-storage-hub-proposed-for-central-qld/"
site_name: "AHLEC"
content_type: "article"
breadcrumbs: "Home > Solar News > Huge Generation and Storage Hub Proposed for Central QLD"
description: "RES and Energy Estate have proposed a huge generation and storage hub for Central Queensland to supply electricity to heavy industry in the area."
keywords: "Solar News"
language: "en"
categories:
  - "Solar News"
word_count: 367
reading_time: "2 min read"
summary: "RES and Energy Estate first proposed a huge renewable energy generation and storage hub for Central Queensland back in October 2021, with plans to supply electricity to heavy industry in the region..."
last_modified: "2026-09-01T21:27:16+10:00"
schema_type: "Article"
related_posts:
  - title: "Tesla Battery Scheme Rolled out to SA Homes Without Solar to Help Build Virtual Power Plant"
    url: "https://ahlecsolar.com.au/2021/08/13/tesla-battery-scheme-rolled-out-to-sa-homes-without-solar-to-help-build-virtual-power-plant/"
  - title: "Tesla Powerwall 3 vs Sigenergy SigenStor &#8211; Which Battery Is Right for Your Home?"
    url: "https://ahlecsolar.com.au/2026/09/28/tesla-powerwall-3-vs-sigenergy-sigenstor-battery-comparison/"
  - title: "Understanding the Importance of Net Metering in off grid solar setups"
    url: "https://ahlecsolar.com.au/2024/02/07/understanding-the-importance-of-net-metering-in-off-grid-solar-setups/"
estimated_tokens: 478
---

# Huge Generation and Storage Hub Proposed for Central QLD

![Solar plant](https://ahlecsolar.com.au/wp-content/uploads/2021/09/solar-plant-PADS7DX-min.jpg)

RES and Energy Estate first proposed a huge [renewable energy generation](https://ahlecsolar.com.au/solar-on-grid/) and storage hub for Central Queensland back in October 2021, with plans to supply electricity to heavy industry in the region, including the aluminium smelter at Boyne Island.

At the time, the developers said the Moah Creek Renewable Energy Project would sit 30km west of Rockhampton as the first stage of a proposed 2GW renewables hub, the Central Queensland Power Project (CQP).

#### A hopeful future

The Moah Creek part of the project will involve 400MW of wind power and 200MW of solar, together with a 300MW big battery – storage hours are to be determined later. This project is in its infancy, with community meetings starting in late September.

RES and Energy Estate believe that the power project will help to transition Central QLD’s power supply to firmed-up renewables and thereby help to secure the region’s heavy industries for the future.

Moah Creek has good wind speeds, is close to transmission lines and transport links, so is the ideal location for such an endeavour, especially as it’ll involve minimal disruption to the environment and community.

The Moah Creek facility would be located close to the Stanwell coal fired power station, and among the major industrial loads in the area are the Boyne smelter and various proposed green hydrogen/ammonia projects in Gladstone.

#### New jobs, clean energy

The CQP will, say the developers, use their joint experience and strengths and will bring new jobs and cheap, clean energy to the region’s heavy industries, making them more competitive.

The project is one of several gigawatt-scale hybrid proposals springing up throughout Australia. These projects are necessary to replace the aging coal plants and also to supply cheap, clean electricity to heavy industry and to renewables-powered hydrogen and ammonia facilities.

#### Smelters and refineries are cleaning up their acts

The country’s bigger smelters and refineries have historically relied on coal or gas generation for their electricity, but are now turning towards solar and wind. Solar and wind provide cheap energy that’s also clean, which is a winner with customers. Renewables can also be firmed up much more easily now, which makes the supply reliable and secure.


---

_View the original post at: [https://ahlecsolar.com.au/2021/10/22/huge-generation-and-storage-hub-proposed-for-central-qld/](https://ahlecsolar.com.au/2021/10/22/huge-generation-and-storage-hub-proposed-for-central-qld/)_  
_Served as markdown by [Third Audience](https://github.com/third-audience) v3.6.1_  
_Generated: 2026-11-15 02:29:44 UTC_  
